Skip to content

ci: add schedule reporter and cb failure reporter files #4652

ci: add schedule reporter and cb failure reporter files

ci: add schedule reporter and cb failure reporter files #4652

Triggered via pull request April 2, 2025 21:59
@kgala2kgala2
synchronize #1260
cb-reporter
Status Cancelled
Total duration 6h 0m 15s
Artifacts

tests.yml

on: pull_request
Matrix: integration tests
Matrix: unit tests
Fit to window
Zoom out
Zoom in

Annotations

20 errors
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (macos-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
integration tests (windows-latest, 3.9)
Event loop is closed
unit tests (3.9)
The operation was canceled.
unit tests (3.9)
The job has exceeded the maximum execution time of 6h0m0s